Elbe, Wedel, - Bauarbeiten/ Works

Navinfo near Wedel (Altstadt)

Last edited 31.08.2024 at 12:00 by NV Charts Team

Latitude

53° 34’ 13” N

Longitude

9° 40’ 37.5” E

Information

Valid from 12.06.2024
Valid until 15.07.2025

In the period from 12.06.2024 to presumably 15.07.2025, extensive renovation work and the new construction of the wave protection walls at the entrances to the Hamburg marina in Wedel (km 643) will take place.

The work will be carried out with floating equipment and will begin at the east entrance to the port in the period from 12.06.2024 until presumably 20.12.2024.

The work at the port entrance West is planned for the period from 02.12.2024 to 15.07.2025.

Shipping is asked to pay attention and show consideration.

Comments

No comments or ratings have been added to this POI.

You can add comments with the NV Charts App (Windows - iOS - Android - Mac OSX).
You can download the current version at nvcharts.com/app.

Buy nv charts covering this place Clicking one of the products will open the nv charts shop.

Places nearby